The Gluck construction process commands stringent cost controls and the fastest possible turn around times. Features include (continued):

• Careful review of all construction documents with governmental agencies and inspectors, subcontractors, engineers, estimators, and supervisors.
• Extensive field supervision by experienced staff at all stages of construction.
• Experience with alternative materials, efficient designs and advanced construction methods.
• Implementation of OSHA and SWPPPS requirements, loss control measures, and on-site safety meetings.